Current transformer applications in Bolivia: Measurements in buildings, factories, and workshops have been improved with the help of HEYI RECT.

1. Why are reliable current transformers needed at different current measurement points?

In Bolivia, electricity usage varies across commercial buildings, factories, and industrial workshops. Building electricity consumption can fluctuate throughout the day, factories may continue to use electricity even after production has stopped, and outdoor workshops may require safe access to the meter without opening the distribution panel.

Electrical engineers face challenges beyond measuring high currents; they also need to ensure reliable energy measurements under varying load conditions. This requires consideration of available space, cable dimensions, and measurement requirements. The Heyi RECT series of current transformers is designed to meet these practical needs.

2. How can RECT improve three-phase voltage measurement in commercial buildings?

2.1 Measurement of Aggregate Demand along the Main Supply Line

The office building’s elevators, ventilation system, lighting, and tenants’ electrical appliances operate simultaneously. By installing current transformers to measure the three-phase current of each phase of the main power grid , three-phase meters can be used to monitor the building’s overall electricity consumption.

For example, a 75 kVA, 400 V three-phase power supply consumes approximately 108 A of current under rated load. A suitable 150/5 A rated current transformer (CT) can convert the primary current into a standard 5 A secondary signal for use by the power supply meter.

The HEYI RECT-66A current transformer offers a 66 mm input conductor window, suitable for compatible input conductors. Its 0.3-class accuracy and specific power ratings allow engineers to optimally match the current transformer to the appropriate measurement system.

Three-phase electricity meter cabinet for Bolivia

2.2 Maintain measurement accuracy as building requirements change.

Commercial buildings rarely operate at full capacity 24/7. At night, typically only security systems, emergency lighting, and essential equipment are operational.

Standard current transformers are primarily used for peak power but may not provide the required measurement accuracy across the entire load range. Extended-range current transformers (RECTs) maintain their accuracy and rated current capacity over a range of 1% to 150% of the rated primary current.

The expanded operational scope enables building operators to use a single metering system to track daytime energy consumption and nighttime energy reductions.

3. How can remote power inverters help factories control energy consumption?

3.1 Use a CT scanner to measure production time and waiting time.

For example, suppose a packaging plant in Bolivia consumes 500 amps of current during production. When the conveyor belts and compressors stop running, the control cabinets, safety devices, and emergency power systems will still consume approximately 5 amps of current.

The current transformer (500/5 A) must be suitable for both operating modes. The standby load of the 5 A transformer is only 1% of the rated primary current.

The HEYI RECT-78A switch is available in 500/5A configurations and has a window size of 78mm, making it suitable for power systems of the corresponding capacity.

3.2 The measurement range has been expanded from 5 A to 750 A.

The RECT-78A extended-range current transformer offers a nominal accuracy of 0.3 V to 0.5 V and a load power range of 1% to 150% of the rated primary current.

For the 500/5A model, this equates to a single current measurement range of 5 A to 750 A. This allows engineers to monitor both low standby power consumption and higher production loads without needing to replace the current transformer.

For businesses assessing energy costs, identifying nighttime energy consumption can help identify unnecessary standby loads, improve energy management, and provide a more detailed breakdown of energy costs by production line.

HEYI Waterproof Electrical Test Cabinet in a Downpour

4. How does the RECT method simplify measurements in outdoor workshops?

4.1 Ensure that the meter is installed at the facility entrance.

In workshops and small industrial sites, electricity meters are typically installed near the building entrance. This allows power company personnel to read the meter readings without having to enter the production area.

HEYI RECT current transformers are suitable for both indoor and outdoor installation. Their secondary windings feature short-circuit protection, and protective terminal covers ensure a tight seal and protect measurement connections.

These features are particularly useful for meter boxes that require controlled access and security checks.

4.2 Select an appropriate incoming line window size

Underground power cables typically enter the outdoor distribution box from the bottom cable inlet and then connect to the main switch. Due to limited installation space, the size of the current transformer is particularly important.

The RECT series offers three window diameter options:

  • RECT-38A: 38 mm window
  • RECT-66A: 66 mm window
  • RECT-78A: 78 mm window

This product series has a rated current range from 100/5 A to 800/5 A, allowing engineers to select the appropriate configuration based on the supply current and cable size. It is compatible with 50/60 Hz applications, conforms to the IEEE C57.13 standard, and supports voltages up to 0.72 kV.

5. Which HEYI-RECT current transformer is suitable for your project?

From sockets in commercial buildings to power supplies in factories and cash registers in outdoor workshops, HEYI RECT provides energy metering solutions that adapt to load fluctuations and actual installation requirements.

Please provide your line voltage, required accuracy, cable dimensions, and measuring instrument load. HEYI will assist you in selecting the appropriate rectifier model and provide technical data, dimensional diagrams, and a quote.

Compay:HEYI Electrical Co., Ltd.
Brand: HEYI/ASCT
Contact: Bethy
E-mail: heyi@heyiele.com             
Tel: 86-13968747975

--- END ---

LATEST NEWS

JOIN US

Register as one of our members and provide you with the latest product and discount information.